读书人

DL/T5371~2007水电水利工程土建施工安

发布时间: 2010-02-24 01:32:53 作者:

 DL/T5371~2007水电水利工程土建施工安全技术规程(英文版)


基本信息出版社:中国电力出版社
页码:291 页
出版日期:2009年05月
ISBN:9787508380834
条形码:9787508380834
版本:第1版
装帧:平装
开本:32
正文语种:英语

内容简介 《DL/T5371~2007水电水利工程土建施工安全技术规程(英文版)》内容为:This Standard is a revision of Technical Code for Installation Safety inWater Resources and Hydropower Project (SD 267——1988) (hereinafterto be refeired as the former Standard) according to the requirement ofNotification of General Office of National Development and ReformCommission about printing and distributing the plan of Industrial Codesin 2006 (FGB Industrial [2006] No. 1093).
编辑推荐 《DL/T5371~2007水电水利工程土建施工安全技术规程(英文版)》由中国电力出版社出版。
目录
Foreword
1 Scope
2 Normative References
3 Terms and Definitions
4 General
5 Earth and Rock Excavation
6 Foundation Treatment Works
7 Aggregate Production
8 Concrete Works
9 Bituminous Concrete
10 Masonry
11 Embankment Works
12 Dredging and Dredger Fill Works
13 Channel, Sluice and Pumping Station Works
14 Building Works
15 Demolition Works
……
序言 This Standard is a revision of Technical Code for Installation Safety inWater Resources and Hydropower Project (SD 267——1988) (hereinafterto be refeired as the former Standard) according to the requirement ofNotification of General Office of National Development and ReformCommission about printing and distributing the plan of Industrial Codesin 2006 (FGB Industrial [2006] No. 1093).
Since the implementation of the former Standard, it has greatlypromoted good normative role for promoting safe and civilizedconstruction of hydroelectric and hydraulic construction enterprisesand effectively controls of various accidents. In recent decade andmore, with the continuous improvement of safety laws andregulations and the wide application of new techniques, newtechnologies, new equipment, new material in hydroelectric andhydraulic construction, safe construction technology need updating.In order to ensure the effectiveness and practicability of the code, it isnecessary to improve and perfect the former code.
文摘 10.1.15Operators are forbidden to enter or exit working front bytaking hoisting machine used to hoist materials, do not throw objectto operator and working area.
10.1.16Before carrying stone, the tool and rope used for carryingoperation shall be checked whether they aresolid enough.Double-rope shall be adopted to bind stones when they are carried bytwo persons or more.
10.1.17If steel hammer is used to dress stones, the hammer shallbe checked whether it is broken or the handle of hammer is strong.Observation shall be made to check whether there is any potentialdanger around threatening the safety of persons. The hammer shalldrop along the grain of the rock; the hammer nose shall be flat. Thehammer shall hit the point accurately.
10.1.18Dressing stones should be carried out on the top of drymasonry or masonry wall or scaffold in order to prevent the wall frombeing disturbed, or to prevent injury caused by falling stones; Facingstone, dimension stone and crushed shall be made on open and fiatground.
读书人网 >水利

热点推荐