基本信息出版社:Wiley VCH
页码:356 页
出版日期:2008年06月
ISBN:3433016763
条形码:9783433016763
装帧:精装
正文语种:英语
外文书名:硬岩隧道掘进机
内容简介 在线阅读本书
This book covers the fundamentals of tunneling machine technology: drilling, tunneling, waste removal and securing. It treats methods of rock classification for the machinery concerned as well as legal issues, using numerous example projects to reflect the state of technology, as well as problematic cases and solutions. The work is structured such that readers are led from the basics via the main functional elements of tunneling machinery to the different types of machine, together with their areas of application and equipment. The result is an overview of current developments.
Close cooperation among the authors involved has created a book of equal interest to both experienced tunnelers and newcomers.
作者简介 About the authors:
The four authors work in various areas of tunneling.
Bernhard Maidl has been Professor for Civil Engineering, Tunneling and Construction at the Ruhr–Universität in Bochum since 1974. In 1979 he founded the engineering firm Maidl und Maidl in Bochum, which is involved in many large and complex tunnel projects in Germany and abroad.
Dr. Herrenknecht is the Founder and Chairman of the world′s leading mechanized shield tunneling company.
Leonhard Schmid is a planner of tunneling projects and manager of a Swiss engineering firm.
Willy Ritz was formerly manager of a tunneling company in Switzerland and has a great deal of experience in the construction sector.
专业书评 This book covers all aspects of TBM tunnelling: boring, driving, muck clearance, support, rock classification for mechanical tunnelling and also contract considerations.
A multitude of example projects clarify the current state of the technology, and problem cases are discussed along with innovative solutions and special equipment.
The close collaboration of expert authors has produced a work of interest to the experienced tunnel builder just as much as the newcomer to the field.