PMP考试中净值治理计算公式 集合

发布时间: 2012-06-20 20:37:21 作者: rapoo

PMP考试中净值管理计算公式 集合
Abb. FormulaDescriptionPV
BCWS
Planned Value or
Budget Cost of Work Scheduled

计划产出

The authorized budget assigned to the scheduled work to be accomplished for a schedule activity or work breakdown structure component. Also referred to as the budgeted cost of work scheduled (BCWS).P472)

1> It includes the detailed authorized work, plus the budget for such authorized work, allocated by phase over the life of the project.(P213)
EV
BCWP
Earned Value or
Budget Cost of Work Performed